FIND A PROJECT
FACILITY TYPE
- Public Buildings
- Offices
- Medical
- Educational
- Stadiums
- Hotels
- Retail/Entertainment
- Industrial
- Residential
- Dams/Power Plants
- Roads/Tunnels/Bridges
- Railways/Airports
- Waterworks
- Historical
COMPANY
Metro Gold Line Eastside Extension LRT Tunnels, Stations, Trackwork and Systems - Design/Build
Facility Type
Railways/Airports
Location
Los Angeles, CA
Start Date
07/2004
End Date
04/2009
PROJECT DESCRIPTION
Underground: Construct twin bored 6,980' x 21' ID soft ground tunnels, cut & cover and u-boat portal sections, and 2 station excavations. Above ground: design and construct 3.8 miles of at-grade, bridge and MSE mainline guideway; and 6 miles of double-track LRT line and systems, trackwork and stations. Light rail mass transit system.
OTHER PROJECT ( ALL PROJECTS)

