BNSF Railroad BR 482.1 West Memphis Bridge Approaches

 

 

Company
KRAEMER NORTH AMERICA
Facility Type
Roads/Tunnels/Bridges
Location
West Memphis, AR
Start Date
10/2015
End Date
10/2017

 

 

PROJECT DESCRIPTION

This is a 3-phase project that includes replacement of the West Approach to the BNSF railway Mississippi River crossing.  There are 27 Spans total, 23 spans are steel decks that will be hoisted into place, with 4 spans that have CIP concrete decks that include roll-in construction methods.  Substructure consists of formed concrete caps and columns, founded on drilled shafts with micropyles. Each phase was completed by a switch out during a 36-hour track outage.

 

 

 

 